I learned from one of the first general contractors I worked for after college that every time you start a new job you are preparing to go to court. I learned to keep a daily diary recording the weather, who was on the job, and what happened. I was never in court (for that) but it’s a practice I try to keep now.
Today is February 22, 2023 and it is starting to snow in southern Arizona, after a night and day of winds at 35 m.p.h. with gusts that might blow a man down. We have the footings excavated and the form boards in place for the slab on grade. The plumber is scheduled for Friday to put in all the drain pipes that need to be under the concrete.
I rented a mini excavator on Saturday the 11th and Russell came and finished the footings Sunday. He makes it look easy, but trust me……it’s not. The outside edge of the footing trench wants to be in line with where the form boards will go for the outside edge of the slab in order to minimize wasting concrete.
Steel was delivered on Thursday, the 16th and we finished the forms, 99% anyway, on Friday. After the plumbing inspection we can lay down the 4″ of gravel sub-base and finish tying the reinforcing steel.